Author: ckcreativedesign

New main header ducting and resizing installed

 

This joinery manufacturer in Dorset wanted to add another tool to the existing set up. This meant we needed to resize the main header ducting in order to maintain the correct airflow. All new ducting was supplied and fitted and all points re connected and put through a new LEV test.

New impeller and motor fitted to a existing system

A new impeller was fitted to the existing set up as the one that was in place had damage. It was changed out for new and re connected and back running again so our customer – a leading manufacturer of electronics in London – were able to continue production.

New wet collector installation onto a aluminium process

A new wet collection unit was installed as the old one was no longer serviceable. This installation for a well established sheet metal fabricators in Crawley included replacement of ducting and re connecting the system to the process follows by a new LEV test.